APEX Construction: Delivering a Landmark - Central Bank of the Republic of Türkiye Campus, Phase 1 (Istanbul International Finance Center)
A flagship project for APEX Construction in 2024 was the successful completion of Phase 1 of the Central Bank of the Republic of Türkiye Campus within the prestigious Istanbul International Finance Center.
This strategic and complex undertaking involved the construction of a cornerstone financial institution, requiring exceptional technical precision, security standards, and architectural integrity. APEX delivered this critical national infrastructure project, reinforcing our expertise in executing high-profile developments that shape economic landscapes.




Project Overview & Significance
In a testament to our engineering prowess and project management excellence, APEX Construction is proud to have led the monumental task of constructing Phase 1 of the Central Bank of the Republic of Türkiye (CBRT) Campus within the visionary Istanbul International Finance Center (IFC). This project is not merely a building; it is a strategic national asset designed to be the nerve center of Türkiye's financial stability and economic policy. As the anchor tenant of the IFC, the CBRT Campus symbolizes the nation's ambition to establish Istanbul as a global financial hub. APEX's selection for this project underscores our recognized capability to handle projects of critical national importance, extreme complexity, and the highest security and quality standards.
Phase 1: Scale, Scope, and Monumental Completion
Phase 1 constitutes the primary headquarters tower, a soaring 59-storey architectural marvel. With a gross floor area (GFA) exceeding 350,000 square meters above ground, the structure is one of the largest and most technically sophisticated buildings in the region. The scope of work undertaken by APEX encompassed the complete shell and core delivery, creating a weather-tight, structurally complete, and internally serviced building ready for the Bank's specialized fit-out.
Defining Achievement: Substantial Completion by September 2024
APEX Construction successfully achieved the substantial completion of all core contractual works for Phase 1 by September 2024, a key milestone that transferred primary operational responsibility to the client. This achievement was the culmination of meticulous planning, relentless execution, and seamless coordination among thousands of professionals and specialists.
Detailed Breakdown of Completion Status (as of Year-End 2024)
By the close of 2024, the project had reached an overall construction completion rate of 99.5%. The detailed progress across all critical subsystems is as follows:
Building Envelope & Structural Integrity:
100% Completion: The building's exterior has been fully enclosed. This includes the complete installation of the high-performance curtain wall system, cladding, and roofing. Achieving a sealed envelope was crucial for allowing interior works to proceed unaffected by weather and for initiating environmental control systems.
Mechanical, Electrical, and Plumbing (MEP) Installations:
99.68% Completion: This near-total completion covers the immense network of life-support systems for the tower:
Mechanical: Advanced HVAC systems for precise climate control, firefighting installations, pressurized stairwell systems, and complex ductwork.
Electrical: Primary and backup power distribution, lightning protection, comprehensive lighting infrastructure, and cable management for future IT loads.
Plumbing: Potable water, sewage, rainwater drainage, and fire suppression piping throughout 59 floors.
Vertical Transportation:
100% Completion: All elevator and escalator installations have been finalized. This includes high-speed passenger elevators, service elevators, and freight elevators, all now installed and integrated into the building's control system.
Testing, Commissioning, and Handover:
95% Completion: This critical phase involves methodically testing every system to ensure it operates as designed, in sequence, and under load. Systems are calibrated, performance is verified against specifications, and operational documentation is prepared. Reaching 95% signifies that the building is functionally operational and in the final stages of client acceptance.
Managing Complexity: Adaptive Execution and Client Collaboration
A significant challenge, expertly managed by the APEX team, involved the simultaneous execution of client-initiated revisions. During the construction phase, the Central Bank instructed design enhancements and layout optimizations to better serve its long-term operational needs. APEX's agile management framework allowed for the controlled demolition and reconstruction of specific sections without impacting the overall critical path or the scheduled September 2024 completion. This demonstrated our unwavering commitment to client partnership, flexibility, and problem-solving in delivering a tailor-made facility.
Operational Excellence: The APEX Methodology
The successful delivery of this landmark project was powered by APEX Construction's core principles:
Integrated Project Delivery: Leveraging advanced Building Information Modeling (BIM) to facilitate clash detection, optimize workflows, and enable perfect coordination between all engineering disciplines.
Next-Generation Safety Culture: Implementing a zero-incident mindset through continuous training, real-time monitoring, and a pervasive safety-first culture on-site, essential for a project of this scale and duration.
Quality as a Foundation: Adherence to international quality standards at every stage, from material procurement to final installation, ensuring longevity and performance.
Sustainability in Practice: Incorporating energy-efficient systems, sustainable materials, and waste management protocols to minimize the building's environmental footprint, aligning with global best practices.
Looking Ahead: A Foundation for the Future
The completion of Phase 1 by APEX Construction has established a formidable foundation for the CBRT's future. The delivered shell and core structure is a state-of-the-art canvas upon which the Bank will implement its secure and specialized operational technology. This project solidifies APEX's portfolio as a builder of institutions and a key contributor to Türkiye's strategic infrastructure. We look forward to continuing our role in shaping the skyline and economic future of the Istanbul International Finance Center, ready to take on the next phase of this transformative development.
Summary for APEX Construction:
Project: CBRT Headquarters, Phase 1 – IFC Istanbul
Achievement: Substantial Completion achieved September 2024.
Key Metric: 59 floors, >350,000 sqm GFA, 99.5% overall completion.
APEX Hallmark: Managed complex client revisions concurrently without delaying the core project, showcasing adaptive execution and deep client collaboration.
Legacy: Delivered the anchor building for a national financial hub, reinforcing APEX's capacity for projects of supreme strategic importance.


Gallery
Istanbul International Finance Center








Contact
Sanberk İşhanı Building
D-130 Karayolu, Cad No: 30/B-34 Başiskele Sahil Mahallesi 41090 Kocaeli TÜRKİYE
Phone
+90 532 389 52 82
© 2025. All rights reserved.